Soilweb cells were installed onto ramp areas due to soil collapses caused by water running off from the Jokiniementie road interachange.
The cells are filled with soil and a Greenfix 9 shrub erosion blanket has been installed on the surface, which allows for the optimisation of plant growth on steep slope surfaces.
The cells were installed in 2009 and 2013.